On August 1, 2005 ground was broken for the remodel of our hacienca.  We will be adding approximately 1500 square feet to the upstairs master bedroom, bathroom, office and downstairs bedroom and bathroom plus stairs with atrium, guest/pool bath and laundry area.

Back of hacienda before ground breaking


Foundation work two weeks after the start of construction

All renovations have their problems----.  The septic tank collapsed while digging the foundation.

The decision was made to connect to the city sewer system and a trench was dug down the outside corridor,

through the hacienda, out the front door to the street.

The start of the foundation work.

The brick walls for the first floor.

Boveda ceiling over the laundry area.

Iron work for the first floor ceiling with brick boveda.

Boveda ceiling for first floor.

The construction crew raising a steel beam for the new roof.

The renovated powder room/pool bath with Talavera tile.

The upstairs office before the walls are removed.

After walls are removed.

Arched wall between the master bedroom new addition.

Atrium over the new stairway.

Cupula in the master bedroom.

Dome in master bathroom.

Artium, dome for master bathroom and cupula with dome for master bedroom.

Master bathroom.

 